Ordering opens soon. The guides, sample kit, blank templates and builder setup are free to look through now.
Home / Guides / Checklist
Checklist

What to include in a homeowner binder: a builder's checklist

Updated November 8, 2026 · Written for home builders

A homeowner binder from a builder should include ten things: a welcome letter, a plain-words warranty summary, how to ask for a repair, emergency contacts, shutoff locations, an appliance register, paint and finish codes, a maintenance schedule, the walkthrough record and the full written warranty.

The checklist

Use this as you assemble each home's binder. Every item names the detail owners ask about most.

1. Welcome letter

  • A short thank you, signed by a real person.
  • Who their warranty contact is, by name.
  • When their check-in visits happen, if you offer them.

2. Warranty summary in plain words

  • Each coverage period, copied from your written warranty.
  • What is not covered.
  • Who provides the warranty.
  • A line saying the written warranty controls.

3. How to ask for a repair

  • What counts as an emergency and who to call.
  • Where routine requests go, in writing.
  • What to include: room, description, date noticed, photo.

4. Emergency contacts

  • Your office, warranty contact and after-hours line.
  • Each trade that worked on the home, with when to call them directly and when to go through you.
  • Utilities and the HOA for that community.

5. Shutoff locations

  • Main water, street or meter shutoff, water heater, gas meter, electrical panel, heating and cooling switch, irrigation.
  • A photo of each. See our shutoff locations guide.

6. Appliance register

  • Brand, model, serial number, install date and registration deadline for each appliance and system.
  • Where the manuals are kept. See our appliance register guide.

7. Paint and finish codes

  • Room by room: paint brand, color name and code, sheen, ceilings and trim included.
  • Flooring, tile, grout and counters.
  • Where touch-up materials were left.

Our paint and finish code register guide shows what to record for each surface and when to fill it in.

8. Maintenance schedule

  • Monthly, seasonal and yearly tasks, such as filter changes, gutter checks and water heater care.
  • A log for the owner to record what they did.

9. Walkthrough record and punch list

  • The room by room checklist from the pre-delivery walkthrough. See our builder punch list guide.
  • Open items with who will fix them and when.
  • Signatures from both sides.

10. The full written warranty

  • At the back, complete and unedited.

Skip the blank page

Every section above exists as a ready page in Builder Handoff Kits, with your logo, your saved team and trades, and photo spots. Ordering opens soon.

See the filled sample kit

What to leave out

  • Loan and closing financials. Those belong with the title company and lender, not in a binder that may be shown to a repair person.
  • Generic brochures. A manual for the exact model beats a marketing flyer.
  • Anything that contradicts your warranty. If a page and the warranty disagree, owners will quote the friendlier one.

Turning the checklist into a manual

Some of these pages stay the same in every home, like the warranty summary and upkeep schedule. Others change with each house. Our homeowner manual template guide shows how to set up both, with sample wording.

Printed, PDF, or both

A printed binder is easy to grab when the water heater leaks. A PDF is easy to search and hard to lose. Many builders do both: hand over the printed copy at the walkthrough and email the PDF the same day.

Questions builders ask

What should be in a new homeowner binder?

A welcome letter, a plain-words warranty summary, how to ask for a repair, emergency contacts, shutoff locations, an appliance register, paint and finish codes, a maintenance schedule, the walkthrough record and the full written warranty.

Should loan documents go in the homeowner binder?

Usually no. Keep financial closing documents separate, since the binder may be handed to repair people and future buyers.

When should a builder give the homeowner binder?

At the final walkthrough or closing, with a PDF copy sent the same day so the owner can search it later.

Sources and further reading